6. Adjust low-heat manifold pressure for propane gas. (See
Fig. 43.)
7. Turn low-heat adjusting screw counterclockwise
(out) to
decrease input rate or clockwise (in) to increase input rate.
NOTE:
When correct input is obtained, main burner flame
should be clear blue, almost transparent (see Fig. 47).
8. Jumper R, W/W1 and W2 on control center thermostat
connections. This keeps fltrnace locked in high-heat oper-
ation.
9. Adjust high-heat manifold pressure for propane gas.
10. Turn high-heat
adjusting screw counterclockwise
(out) to
decrease input rate or clockwise (in) to increase input rate.
11. Replace caps that conceal gas valve regulator adjustment
screws.
NOTE:
When correct input is obtained, main burner flame
should be clear blue, almost transparent. (See Fig. 47).
12. Remove jumper across R, Wl, and W2 after high-heat ad-
justment to terminate call for heat.
13. Turn setup switch SWl-2 on fltrnace control to OFF posi-
tion.
14. Turn fltrnace gas valve switch to OFF position.
15. Turn off fltrnace power supply.
16. Remove manometer and re-install manifold pressure tap
plug.
17. Turn fltrnace gas valve switch to ON position.
18. Turn on fltrnace power supply.
19. Set room thermostat to call for heat.
20. Check pressure tap plug for gas leaks when main burners
ignite.
21. Check for correct burner flame.
22. Observe unit operation through 2 complete heating cycles.
23. See Sequence of Operation in furnace Installation, Start-
Up, and Operating Instructions.
24. Set room thermostat to desired temperature.
25. After making the required manifold pressure adjustments,
check and adjust the furnace temperature rise per the fur-
nace installation instructions,
CHECK
LOW
GAS PRESSURE
SWITCH
The newly installed low gas pressure switch is a safety device
used to guard against adverse burner operating characteristics that
can result from low gas supply pressure. Switch opens at not less
than 6.5 in. W.C. and closes at not greater than 10.2 in. W.C.
This switch also prevents operation when the propane tank level
is low which can result in gas with a high concentration
of
impurities, additives, and residues that have settled to the bottom
of the tank. Operation under these conditions can cause harm to
the heat exchanger system. This normally open switch closes
when gas is supplied
to gas valve under normal operating
pressure. The closed switch completes control circuit. Should an
interruption or reduction in gas supply occur, the gas pressure at
switch drops below low gas pressure switch setting, and switch
opens. Any interruption in control circuit (in which low gas
pressure switch is wired) quickly closes gas valve and stops gas
flow to burners. When normal gas pressure is restored, the system
must be electrically reset to re-establish normal heating operation.
Before leaving installation,
observe unit operation through 2
complete heating cycles. During this time, turn gas supply to gas
valve off just long enough to completely extinguish burner flame,
then instantly restore full gas supply. To ensure proper low gas
pressure switch operation, observe that there is no gas supply to
burners until after hot surface igniter begins glowing.
LABEL
APPLICATION
1. Fill in Conversion Responsibility Label 337704-204
and
apply to Blower Access Door of furnace as shown. Date,
name, and address of organization making this conversion
are required.
2. Attach Conversion Rating Plate Label 337704-204
to out-
er door of furnace.
3. Apply Gas Control Conversion Label: For 2-stage J and
G gas valves,
use
Gas
Control
Conversion
Label
337780-202.
(Do not use 337780-203,
which is similar.)
For 2-stage E gas valve, use Gas Control Adjustment La-
bel 337780-203.
(Do not use 337780-202, which is simil-
ar.)
4. Replace control access door, blower access door and outer
door of furnace.
CHECKOUT
1. Observe unit operation through 2 complete heating cycles.
2. See Sequence of Operation in furnace Installation, Start-
Up, and Operating Instructions.
3. Set room thermostat to desired temperature.
THiSFURNACEWAS CONVERTED
ON
TO PROPANEGAS
(DAY-MONTH-YEAR)
KiT NO.: KGANP5201VSP
BY:
(Name and address of organization
making this conversion),
which accepts the responsibRRy that this conversion
has
been properly made.
CE GENERATEUR D'AiR CHAUD A i_T¢
CONVERTILE
POUR
(JOUR-MOIS-ANNEE)
DE L'ENSEMBLE N°.: KGANP5201VSP
PAR:
(Nora et adresse de ['organisme qui a effectu_, la conversion),
qui accepte
|' entri_re responsabRitO
de la conversion.
337704-205 REV.B
Fig. 48 - Conversion
Rating
Plate Label
Al1296
25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents