Step 7. Attach the Firebox Unit to the two Side Panels using 4 M6*12 Bolts.
Step 8. For Patio Series MVP Models (PMV06091 and PMV06094):
A. Loosen 2 Bolts on each of the side panels on the front of the Firebox Unit as shown below. Do not
completely remove the Bolts from the Firebox Unit as these will be used to hang the side shelves in Step 8C.
Team Grill Patio Series User Guide
Loosen these bolts on
each side of the
Firebox Unit. Do not
remove them
completely.
Page 22