Travis Industries DVS GSR Owner's Manual page 44

Green smart (au) inbuilt direct vent fireplace insert
Hide thumbs Also See for DVS GSR:
Table of Contents

Advertisement

44
Optional Equipment
6
Remove the pilot orifice following the instructions below (NOTE: Orifice sizes are shown in DMS).
Replace with the propane pilot orifice.
Lift the pilot hood
a
off the pilot
assembly.
7
Replace the firebox components. Install the logs and embers. Replace the glass.
8
Carefully remove the control cover to access the stepper motor (see the illustrations below). The
stepper motor (adjustable regulator) has an installation sheet included with it – make sure to follow all
of the directions. Disconnect the wiring from the stepper motor. Remove the stock stepper motor
and replace with the LP version. – MAKE SURE IT IS CORRECTLY ORIENTED. Secure using the
screws included with the motor – tighten to 25 Lb-inches. Leak test this area after installation to
verify proper installation. Re-attach the wiring.
9
Make the gas line connection, bleed the gas line (if applicable), start the heater and thoroughly leak-
test all gas connections and the gas control valve.
© Travis Industries
(for qualified installers only)
Remove the orifice and replace with the LP orifice. Screw the
c
orifice all the way in and replace the pilot hood.
Use a hex wrench to
b
unscrew the orifice.
5/32" Hex
NOTE: when re-attaching,
this pin lines up with the
notch in the pilot hood.
4100105
Orifice Identification:
LP (Propane) Orifice
35
35
NG (Natural Gas) Orifice
62
100-01245_000

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents