Requirements For System Installation - RED COMPACT 18 Installation And User Manual

Pellet boiler hydro model
Hide thumbs Also See for COMPACT 18:
Table of Contents

Advertisement

4-INSTALLATION AND ASSEMBLY

REQUIREMENTS FOR SYSTEM INSTALLATION

the minimum distance in front of the product to allow for cleaning, maintenance, etc. must be at least 1000 mm;
the minimum admitted distance between the rear of the product and the wall must be 400 mm;
the minimum distance between the upper part of the product and a wall (ceiling) must be of 400 mm to ensure easy access for heat
exchanger cleaning and maintenance (for example to remove ashes);
the minimum distance between the product and wall must be 300 mm.
It is essential to make ventilation holes connecting to the exterior and in compliance with Standard UNI 10683, with the following
characteristics:
They must have a section of at least 100 cm
1.
2.
They must be made at a height close to that of the floor;
3.
They must be adequately protected by wire mesh or grille, provided it does not reduce the minimum passage section;
4.
They must be positioned in such a way as not to be clogged.
Proper air flow can also be guaranteed by openings to an adjacent room, as long as it has direct ventilation and is
not an environment with danger of fire, such as storage rooms, garages or warehouses as regulated by Standard
UNI 10683.
It is good practice to install the boiler in rooms in which there are no leaking devices with respect to the room or appliances which may
cause depression in the room itself with respect to the external environment thus causing poor draught problems of the smoke evacuation
system (UNI 10683).
18
300
600
500
1000
;
2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Compact 24

Table of Contents