RED COMPACT 18 Installation And User Manual page 19

Pellet boiler hydro model
Hide thumbs Also See for COMPACT 18:
Table of Contents

Advertisement

4-INSTALLATION AND ASSEMBLY
Therefore, the end user is responsible for product storage, disposal or possible recycling in compliance with the relative
applicable laws. Position the product without its cladding and connect it to the chimney. Once the connections are complete, assemble
the cladding (steel sides).
If the product must be connected to an exhaust pipe that goes through the rear wall (to enter the chimney), make sure not to force it in.
Adjust the 4 feet (J) to level the boiler so that the smoke exhaust and the pipe are coaxial. The ceramic sides must not be fitted when the
feet are adjusted as this is carried out inside the cladding.
Attention!!
If the boiler smoke outlet is forced or used improperly to lift it or position it, the operation of the boiler can be
damaged irreparably.
1. TURN THE FEET CLOCKWISE TO LOWER THE PRODUCT.
2. TURN THE FEET ANTI-CLOCKWISE TO RAISE THE PRODUCT.
Technical Dept. - All rights reserved - Reproduction is prohibited
FOOT J
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Compact 24

Table of Contents