INSTALLATION
seCtiOn 1:
The list below includes by name the major parts included in your GT package. The tools list
indicates all of the tools necessary to complete the GT install.
• Voltage Meter (optional)
1.
The GT/Watch Dog Head Unit
2. OBDII Adapter Plug
3.
Main Wire Harness
10
Parts Included
tOOls needed
• Fuse Puller
eXtra parts (optional)
• Fuse Jack
• Spade connector
4.
The GT/Watch Power Wire
5.
Micro SD Card
3.
Windshield Mount