Assembly; Installation - Jet JMD-15 Owner's Manual

Mill/drill machine
Hide thumbs Also See for JMD-15:
Table of Contents

Advertisement

Assembly

1. Screw rubber handles (A, Fig. 1) onto
handle shaft (B, Fig. 1). Screw handle shaft
into downfeed hub (C, Fig. 1) and tighten.
Flat
spot
on
shaft
combination or adjustable wrench.
Handle shafts are already installed into hub
on JMD-18PFN.
2. Repeat for other two shaft assemblies.
3. Slide crank (D, Fig. 2) onto shaft and tighten
set screw (E, Fig. 2). Be sure set screw
seats on flat part of shaft.
4. Thread handle (F, Fig. 2) into crank and
tighten.
5. Slide handwheel (G, Fig. 3) onto table
handwheel shaft and tighten set screw.
Insert handle (H, Fig. 3) into handwheel and
tighten.
6. Repeat for two remaining table hand
wheels.

Installation

WARNING

Machine is heavy! Use an appropriate
lifting device and use extreme caution when
moving the machine to its final location.
Failure to comply may cause serious injury!
1. The location for the mill/drill should be well
lit, dry, and have room enough to allow the
head to rotate 360°.
2. Open the belt cover and thread the lifting
hook into the head.
hole found between the column and the
spindle pulley.
3. Carefully lift the mill/drill with properly rated
equipment to a sturdy stand or work bench.
For best performance, through bolt the
mill/drill to a bench or stand.
4. Remove the lifting hook.
5. Before bolting the mill/drill to a bench or
stand, the unit must be level in both
directions. Place a level on the table in both
directions.
6. If the table is not level, shim under the low
corner(s) until level. Tighten the fastening
accommodates
a
Note:
There is a threaded
bolts.
Check for level again.
necessary until the mill/drill is level after the
fastening hardware has been tightened.
7
Adjust as

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jmd-18Jmd-18pfn

Table of Contents