NEC N8100-1429F User Manual page 74

Express5800/110ri-1
Table of Contents

Advertisement

3-16 Setting Up Your Server
4.
While pushing the left and the right unlock buttons on the front of the server, pull out the
server from the rack slowly and carefully.
The server clicks to be latched.
5.
While pushing the right and left release levers (blue) forward or rearward to unlock,
slowly pull out the server from the rack.
IMPORTANT:
the rack. Doing so may cause personal injury if the server drops.
6.
Firmly hold the server, and take it out from the rack.
IMPORTANT:
Pull out the server slowly holding the bottom of the server by at
least two persons.
Do not apply any load on the server pulled out from the rack. Doing
so may cause personal injury if the server drops.
Be very careful not to get your finger caught in the levers or rails.
Press this button to
unlock the server.
Release lever (blue)
Do not apply any load on the server pulled out from

Advertisement

Table of Contents
loading

This manual is also suitable for:

N8100-1430fN8100-1431fN8100-1450fExpress5800/110ri-1

Table of Contents