STA-RITE Heater
1. Turn power off to heater.
2. Remove upper jacket and open the control box.
3. Remove the jumper for the "fireman's switch.
4. Wire to the Pro Logic using wire rated for 105°C minimum.
Fireman's
Switch
Operating
'Control
Terminal
Board
STA-RITE
Hayward Variable Speed Filter Pump: Refer to the diagram below for proper low voltage communication wiring
between the Pro Logic and the Hayward Tristar Variable Speed Control (VSC).
Use four conductor cable (typically phone cable) for communications connection between the VSC and the Pro Logic.
The maximum wiring distance is 500 feet (160 meters). Note that the terminals on both the VSC interface board and
the Pro Logic main board are numbered. The terminal connections should be matched between both terminal blocks
(connect 1 to 1, 2 to 2, etc.). The communications cable should be routed through the knockout hole on the left side
of the VSC enclosure, and a watertight fitting should be used to keep water and debris out of the opening. The
communications cable should also be routed away from the Pro Logic and VSC power connections if possible.
Connect screw terminals
"1" to "1", "2" to "2", etc.
RED
BLK
YEL
GRN
VSC
4
GRN
YEL
3
BLK
2
RED
1