PERIODIC MAINTENANCE AND ADJUSTMENT
1
1. Panel B
2. Bolt
2. Push the panel outwards to un-
hook the projection underneath
the panel, and then pull the panel
6
off as shown.
1
1. Projection
To install a panel
Place the panel in the original position,
and then install the bolts.
2
Cowling A
To remove the cowling
Remove the bolts, and then take the
cowling off.
2
1
1. Cowling A
2. Bolt
To install the cowling
EAU46740
Place the cowling in the original posi-
tion, and then install the bolts.
Cowlings B and C
To remove a cowling
1. Remove panel B (if removing cowl-
2. Remove the quick fastener and
6-9
2
ing B) or panel C (if removing cowl-
ing C).
the bolts, and then take the cowl-
ing off.
EAU47582