Download Print this page

Cable Management - CHIEF FWP-110 Installation Instructions Manual

F-series small flat panel mounts

Advertisement

Installation Instructions

CABLE MANAGEMENT

Item
Description
10
COVER, Arm
20
SCREW, Phillips Flat Machine, 8-32 x 3/8"
30
WRENCH, Hex, 3/32" (provided)
1. Attach all cables to display.
2. Open the cable management bracket by sliding it
towards the edge of the arm (See Figure 20).
NOTE: If necessary, cable management bracket attach
screws may be loosened using hex key (30).
Attach
Screws
OPEN Position
View from Bottom
Figure 20: Height Adjustable Arm -
Cable Management Bracket
CAUTION: Ensure that adequate cable slack exists for
movement of display, and that cables will not be
pinched when bracket is closed.
3. Carefully insert cables into bracket (See Figure 21).
Cable Management
Bracket (in open position)
Cable Path (typical)
NOTE: Display not shown for clarity.
Figure 21: Height Adjustable Arm - Cable Path
Qty
1 per arm
2 per arm
1
CLOSED Position
4. Close cable management bracket by sliding it back
towards the centerline of the arm (See Figure 20).
NOTE: If necessary, cable management bracket attach
screws may be tightened using hex key (30).
CAUTION: Ensure that adequate cable slack exists for
movement of display, and that cables will not be
pinched by installation of cover (10) or screws (20).
5. Carefully insert cables in cavity located in lower
portion of mount arm (See Figure 22).
6. Using Phillips screwdriver, install cover (10) with two
screws (20).
90
Figure 22: Static Arm - Cable Path
NOTE: Installation is complete.
Model: F-Series
Cable Path
(typical)
10
20
13

Advertisement

loading