Step 8, Install Decorative Duct Covers - GE Monogram ZV850 Installation Instructions Manual

36" island vent hood
Hide thumbs Also See for Monogram ZV850:
Table of Contents

Advertisement

8
Step
Pretap
2 Screw
Install
Holes
Decorative
Duct Covers
• Pretap or drive decorative screw into the
• Separate the two decorative duct covers.
• Select the inside (top) cover, which has two
• Slide the decorative duct cover over the
• Attach to the hood support at the top with
Install Screw on
Each Side
Top Duct
Cover
screw holes on the support frame. This will
make screw installation easier.
screw holes in the top.
support frame and push to the ceiling.
2 supplied decorative screws.
Installation
Top Duct
Cover
Top Duct
Bottom Duct
Cover
Cover
• Locate the stop screw in the envelope taped
to the front of the hood. Set aside.
• Slide the bottom decorative duct over the
installed top duct and push up past the stop
screw hole location.
• Install the supplied temporary stop screw in
one of 3 holes in the support frame or the
top duct cover to prevent the bottom
decorative duct cover from sliding down.
installed. Failure to do so could result in
personal injury or damage to the duct
cover.
36" Island Vent Hood
Bottom Duct Cover
Stop Screw
The stop screw must be
Install Stop
Screw in One
of 3 Holes
11

Advertisement

Table of Contents
loading

Table of Contents