CAUTION WARNING If you have questions concerning the installa- TO REDUCE THE RISK OF FIRE, ELECTRIC tion of this product, call the GE Answer SHOCK OR INJURY TO PERSONS, OB- Center® Consumer Information Ser vice at SERVE THE FOLLOWING: 800.626.2000, 24 hours a day, 7 days a week.
Design Information Professional Vent Hoods These hoods can be installed into a soffit, or 48" Wide Models: Models when there is no soffit, they can be installed ZV881WSS, ZV880WSS – with tapered sides Available directly onto a wall. ZV891YSS, ZV890YSS – with straight sides 36"...
Design Information Professional Vent Hoods These vent hoods must be installed 30" Min. The rating plate is located behind filter Product and 36" Max. above the cooking surface. cutouts. To verify your model number, remove Dimensions Installation will be easier if the vent hood filters.
Design Information Professional Vent Hoods Installation Framing for adequate support Ductwork planning Advance These vent hoods are heavy. Adequate struc- • Determine the exact location of the vent hood. Planning tural support must be provided. Hoods must be • Plan the route for venting exhaust to the secured to vertical studs or to studs in the outdoors.
* Actual length of straight duct plus duct fitting equivalent. Equivalent length of duct pieces are based to 3-1/4" x 24" on actual tests conducted by GE Evaluation Engineer- ing and reflect requirements for good venting performance with any ventilation hood.
Installation Professional Vent Hoods Locate the hardware accessory box packed with range hood and check contents. Step Check Installation Filter(s) Grease Heat Lamp(s) Halogen Hardware Tray(s) (on some models) Bulbs We recommend that the vent hood and/or duct cover be on site before S tep final framing and wall finishing to more accurately locate the ductwork...
Installation Professional Vent Hoods 7" Min. (30" and 36" Models) 10" Min. (48" Models) NOTE: A decorative duct cover is available for wall mount installations. The duct cover Step conceals the duct run from the top of the hood to the ceiling. Choose the 6" or 12" Construct cover based upon installation height of the vent hood.
Installation Professional Vent Hoods • Drill 3/16" pilot holes through the shims and Step into the soffit studs. • Hold the hood against the soffit and secure SOFFIT INSTALLATION with 6 lag screws with washers. Install Hood • For additional support and to minimize vibration during operation, we recommend Below Soffit that the hood be secured to the back wall.
Installation Professional Vent Hoods WALL MOUNT INSTALLATION • Drill 3/16" pilot holes, approximately 1-1/2" Step deep, in all mounting screw locations. Ceiling • Hold the hood in position and drive lag screws in top left and right mounting holes. Install Hood NOTE: 5/16"...
ZX48AY, 4-1/2" x 18-1/2" transition to 10" round straight up exhaust. ZX48BY, 4-1/2" x 18-1/2" transition to 10" round direct to rear exhaust. Call your GE Dealer to order. Hold the liner below the installed hood. • Reconnect the male/female connector plug Step to heat lamp and one to blower.
Installation Professional Vent Hoods “WSS” Duct Covers • Fasten the duct cover to the top of the hood Step with 2 screws. Install Duct Cover Secure with Screws “YSS” Duct Covers • Install one side piece to the top of the hood with 2 screws.
Page 16
To obtain specific information concerning any ® Monogram product or service, call GE Answer Center consumer information service at 800.626.2000—any time, day or night. For Monogram local ser vice in your area, call 1-800-444-1845.
Need help?
Do you have a question about the Monogram ZV881WSS and is the answer not in the manual?
Questions and answers