Step 6, Secure Wiring; Step 7, Size And Install Ductwork - GE Monogram ZV850 Installation Instructions Manual

36" island vent hood
Hide thumbs Also See for Monogram ZV850:
Table of Contents

Advertisement

Step
6
Wiring
• Route house wiring through the ceiling hole
• Tape the wire to the front of the frame
Secure
Wiring
7
To Find Required Duct Length:
• Measure from house duct flange to bottom
S tep
Size And
Install
Ductwork
• Cut the 6" duct to required length.
Note: The bottom of the duct must be external
(female) connection to the top of the hood.
The bottom end should be flared slightly, to
facilitate installation of the hood.
• Install duct up through support frames and
• Seal the connection with duct tape.
10
and pull a length to reach the hood junction
box, approximately 6" below the support.
support to prevent damage during installa-
tion and service.
of support frame. (Dimension A)
– Add at least 1" to Dim. A for duct overlap at
the top.
– Subtract 1-3/4" for hood insertion into the
bottom of the frame to determine required
duct length.
attach to house ducting with sheet metal
screws.
Installation
36" Island Vent Hood
Front Side
Support
Frames
House Duct
Side
View
Support
Frame
Duct Connection
To Hood
Bottom Support
Frame Flange
Ceiling
Tape
House
Wiring
Ceiling
Required
Duct
Duct
Length
Dim. A
1-3/4"

Advertisement

Table of Contents
loading

Table of Contents