Connect the appropriate external switch to terminal block 5, normally-closed REPO. Connect Pin 1 to
3.
Pin 1 and connect Pin 2 to Pin 2 of each UPS, and then discard the jumper from terminal block 5.
IMPORTANT:
load loss. For more information, see "Verifying the REPO port connection (on page 71)."
Always test the REPO function before applying the critical load to avoid accidental
UPS installation 49