HP R1500 - UPS XR User Manual page 33

Hp 3 phase ups user guide
Table of Contents

Advertisement

Reconnect terminal block 4, normally-open REPO, and then power on the UPS manually to restart. The
4.
pins should remain open to keep the UPS running.
Verify that the jumper is inserted in terminal block 5.
5.
Connecting to a normally-closed contact
IMPORTANT:
output.
You can install an optional REPO circuit that shuts down the entire parallel system using a single switch. To
install a REPO switch for a parallel system, the selected REPO command (NO or NC) contacts from each UPS
in the system must be in parallel.
To install a REPO switch for a parallel system:
Verify that the UPS system is powered down and all power sources are removed. For more information,
1.
see "Powering down the parallel system (on page 73)."
Mount the remote REPO switch. HP recommends mounting the REPO switch near the operator's
2.
consoles or near the exit doors. For enclosure dimensions and wiring knockouts, see the REPO switch
manufacturer's installation instructions.
The remote switch must be in the closed position to enable power to the UPS
UPS installation 33

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3 phase series

Table of Contents