Aligning The Bracket - HP Cluster Platform Hardware Kits v2010 Installation Manual

Hp 16/18-port cable management kit installation guide (538272-doc)
Hide thumbs Also See for Cluster Platform Hardware Kits v2010:
Table of Contents

Advertisement

2 Aligning the Bracket

Figure 2
shows the correct orientation of the cable management bracket which you must install
before connecting the cables to the InfiniBand switch module. During the cabling procedure, the
bracket provides strain relief for the InfiniBand ports, and maintains the correct minimum cable
bend radius.
Figure 2 Bracket Orientation
The following list describes the callouts shown in
1.
Mounting hook installed in one of the mounting holes in the rack's rear left column
2.
Cable management bracket
Callout 1 shows the bracket's mounting hook installed in one of the square holes in the left rear
rack column. The actual mounting locations for a bracket are relevant to the location of the c-Class
enclosure in the rack, and must align with the InfiniBand switch installed in the c-Class enclosure.
Figure 3
shows the relative mounting locations.
Figure 3 Three Bracket Mounting Locations
U10
U9
U8
U7
U6
The following list describes the callouts shown in
1
2
1
2
3
4
Figure
2:
Figure
3:
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

16/18-port cable management kit

Table of Contents