HP Cluster Platform Hardware Kits v2010 Installation Manual page 10

Hp 16/18-port cable management kit installation guide (538272-doc)
Hide thumbs Also See for Cluster Platform Hardware Kits v2010:
Table of Contents

Advertisement

Figure 4 A Cable Management Bracket Holding 16 InfiniBand Uplink Cables
The following list describes the callouts shown in
1.
Left rear rack column
2.
16 secured InfiniBand cables
3.
One of the 16 releasable cable ties (completed assembly for 16-port switch shown)
Important:
You must install the HP BladeSystem c-Class enclosure cable management bracket to provide proper
strain relief for the InfiniBand cables.
To install the InfiniBand cables and secure them with the releasable cable ties, follow these steps:
1.
Install the push-button mounts by pressing them upward into each hole in the cable management
bracket (see callout 4 in
2.
Cable the lower InfiniBand switch first, as described in the hardware installation guide for the
switch.
3.
To secure an InfiniBand cable (callout 1 in
the releasable cable tie through the push button mount and around the InfiniBand cable (see
callout 2 in
10
Installing the Cable Management Bracket
1
3
Figure
1).
Figure
5) and through the releasable cable tie lock.
2
Figure
4:
Figure
5) to the cable management bracket, slide