Delivery Survey - HP 9000 rp3410 Manual

Generic site preparation guide - edition 6
Hide thumbs Also See for 9000 rp3410:
Table of Contents

Advertisement

Table 1-8 Site Inspection Checklist (continued)
Check either Yes or No. If No, include comment number or date.
30.
Are air-conditioning filters installed and clean?
Storage
Number
Area or Condition
31.
Are cabinets available for tape and disc media?
32.
Is shelving available for documentation?
Training
Number
Area or Condition
33.
Are personnel enrolled in the System Administrator's Course?
34.
Is on-site training required?

Delivery Survey

The delivery survey forms list delivery or installation requirements. If any of the items on the
list apply, enter the appropriate information
in the areas provided on the form.
Enter any special instructions or recommendations on the special instructions or recommendations
form. The following list gives examples of special instructions or issues:
Packaging restrictions at the facility, such as size and weight limitations
Special delivery procedures
Special equipment required for installation, such as tracking or hoists
What time the facility is available for installation (after the equipment is unloaded)
Special security requirements applicable to the facility, such as security clearance
Yes
(Figure 1-13 (page 36)
Comment or Date
No
and
Figure 1-14 (page
Delivery Survey
37))
35

Advertisement

Table of Contents
loading

Table of Contents