10
OPERATION
SPECIAL MOBIL HOME REQUIREMENTS
WARNING: DO NOT INSTALL IN A SLEEPING ROOM.
NOTE: Installation should be in accordance with the Manufactured Home and Safety Standard (HUD), CFR 3280, Part 24
For installation in a mobile home, an outside source of combustion air must be used
(See "COMBUSTION AIR SUPPLY").
The Breckwell Solstice must be grounded to the steel chassis of the home with 8 Ga. copper wire using a serrated or star washer to
penetrate paint or protective coating to ensure grounding.
The stove must be securely fastened to the floor of the mobile home through the two holes in the rear of the stove using 2, ¼" lag bolts that
are long enough to go through both a hearth pad, if used, and the floor of the home. (See figure 11)
Refer to "VENTING" for proper exhaust configurations.
CAUTION: THE STRUCTURAL INTEGRITY OF THE MOBILE HOME FLOOR, WALL AND
CEILING/ROOF MUST BE MAINTAINED.
Bolt Hole
Bolt Hole
FIGURE 11