OBS-5+ System
16
3) Click the
lookup table icon and select a calibration table for your
survey. The last active table will be used otherwise.
4) Click
Survey to select: sensors, lines per minute, and depth units
(Meters or Feet). Set temperature and salinity for the survey area.
5) Click Start Survey and check the data flow in the Data Window.
6) A file for logging data was created when you started the OBS-5+ Utility.
You can review data at any time with
directly into an Excel spreadsheet for post-survey processing and plotting
(see Section 6.2.15, Excel Spreadsheets).
Open and import the log file