Debug Port Check - Toshiba Tecra A2-S316 Maintenance Manual

Maintenance manual
Hide thumbs Also See for Tecra A2-S316:
Table of Contents

Advertisement

2 Troubleshooting Procedures
Procedure 2

Debug Port Check

Check the D port status by a debug port test. The tool for debug port test is
shown below.
The test procedures are follows;
1. Connect the debug test cable to the connector PJ2000 of the system board. For
disassembling to connect the test cable, refer to Chapter 4.
2. Connect the debug port test cable and RS-232C cross cable to the test board.
3. Connect the RS-232C cross cable to the PC that displays the results.
4. Boot the computer in MS-DOS mode.
5. Execute GETDPORT.COM in the text menu in CPU REAL mode. (Insert the FD
for starting D port into FDD and input "FD starting drive:>dport".)
The D port status is displayed in the following form;
6. When the D port status is FFFFh (normal status), go to Procedure 3
7. When the D port status falls into any status in Table 2-3, execute Check 1.
2-20
Figure 2-2 A set of tool for debug port test
Satellite A50/TECRA A2 Maintenance Manual (960-478)
2.4 System Board Troubleshooting

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tecra a2 seriesSatellite a50 series

Table of Contents