Viewing The Details Of A To Do List Entry; Modifying A To Do List Entry - Sharp ZQ-800 Operation Manual

Electronic organizer
Table of Contents

Advertisement

e00_zq800(introduction)60.book Page 83 Wednesday, April 24, 2002 8:45 PM

Viewing the details of a To Do List entry

1.
On the Index screen, highlight the entry you want to confirm by pressing
2.
Press
.
Or
Tap the desired entry.
The Details screen of the selected entry appears.
To Be Done
To Do
field
icons

Modifying a To Do List entry

See page 26 for the basic operations.
Note: If you change the index item from "To Be Done" to "Done", the "DUE
DATE" field changes to "DONE DATE" field.
Checking a finished entry
When you finish a To Do List task, check the Finish check box. If you do not check
the box, the To Do List entry is recognized as unfinished.
To check on the Index or Details screen
1.
On the Index screen, highlight the finished entry by pressing
Or
Open the Details screen.
2.
Tap
(check box).
"DUE DATE" will change to "DONE DATE" that has today's date.
• Repeating the above procedures removes the check.
Done
Status (To Be
Done)
Due date
83
To Do List
.
Status
(Done)
Done date
.

Advertisement

Table of Contents
loading

Table of Contents