IEQ Chek
Operation Manual
11.4. Application Setup and Configuration
Operation of the IEQ Chek dual-probe versions require minimal setup prior to use.
This setup involves:
•
Connecting the temperature/RH probe
•
Connecting the high humidity gas sample probe
•
Configuring/verifying menu items.
Step
Dual-Probe Application: Setup and Configuration Procedure
Locate the temperature/RH probe and connect it to the
DIN-6 connector on the back of the IEQ Chek.
1.
probe has a sintered filter on one end and a male mini DIN-
6 connector on the other.
Locate the high humidity gas sample probe and connect it
to the appropriate port on the back of the IEQ Chek. The
2.
high humidity probe connector on the IEQ Chek is the
threaded brass connector.
3.
Turn on the instrument and wait for the warm-up cycle to complete.
From the SETTINGS → PUMP menu, verify that the pump is configured
for LOW FLOW.
4.
NOTE:
default settings.
configuration.
Return to the main monitoring menu using the PREVIOUS buttons, then
5.
configure the instrument as appropriate for your application and
preferences (e.g., alarming, datalogging, etc.).
Position the temperature probe and gas/RH sample hose appropriately for
6.
your application.
7.
Use your IEQ Chek normally as outlined earlier in this manual.
30
Your high-humidity IEQ Chek is factory-set with appropriate
However, always verify your settings for proper
The
1509-9001 Rev 1