Application Setup And Configuration - Bacharach IEQ Chek Operation Manual

Indoor environment quality monitor
Table of Contents

Advertisement

IEQ Chek
Operation Manual

11.4. Application Setup and Configuration

Operation of the IEQ Chek dual-probe versions require minimal setup prior to use.
This setup involves:
Connecting the temperature/RH probe
Connecting the high humidity gas sample probe
Configuring/verifying menu items.
Step
Dual-Probe Application: Setup and Configuration Procedure
Locate the temperature/RH probe and connect it to the
DIN-6 connector on the back of the IEQ Chek.
1.
probe has a sintered filter on one end and a male mini DIN-
6 connector on the other.
Locate the high humidity gas sample probe and connect it
to the appropriate port on the back of the IEQ Chek. The
2.
high humidity probe connector on the IEQ Chek is the
threaded brass connector.
3.
Turn on the instrument and wait for the warm-up cycle to complete.
From the SETTINGS → PUMP menu, verify that the pump is configured
for LOW FLOW.
4.
NOTE:
default settings.
configuration.
Return to the main monitoring menu using the PREVIOUS buttons, then
5.
configure the instrument as appropriate for your application and
preferences (e.g., alarming, datalogging, etc.).
Position the temperature probe and gas/RH sample hose appropriately for
6.
your application.
7.
Use your IEQ Chek normally as outlined earlier in this manual.
30
Your high-humidity IEQ Chek is factory-set with appropriate
However, always verify your settings for proper
The
1509-9001 Rev 1

Advertisement

Table of Contents
loading

Table of Contents