Flue System; Checks As Part Of The Building Regulations Approval Process - Viessmann KOB PYROTEC Technical Manual

Grate combustion 390 to 1250 kw, fully automatic wood boiler, for the combustion of woodchips, pellets, shavings and mixed wood
Table of Contents

Advertisement

Appendix
(cont.)

7.6 Flue system

Only flue pipes that meet Building Regulations may be used with con-
densing systems.

7.7 Checks as part of the Building Regulations approval process

As part of the Building Regulations approval process, condensing
combustion equipment is tested by the flue gas inspector (where appli-
cable) for adherence to Building Regulations and any generally rec-
ognised technical rules.
7
84
The State Building Regulations, their implementation orders and the
combustion equipment orders, as well as the general building appro-
vals and permits of the higher supervisory authority, in individual
cases, are part of the Building Regulations requirements.
PYROTEC

Advertisement

Table of Contents
loading

Table of Contents