To Install Standard Instruments - HP 8568B Installation And Verification Manual

Spectrum analyzer includes option 001, option 400, option 462, and option 857
Table of Contents

Advertisement

To Install Standard
Instruments
2-4 Installation
1. Place the RF section right-side up on a level work surface.
2. Place the IF-Display section on top of the RF section, offset far
enough forward to allow the RF section hooks to engage the
IF-Display section frame when slid back. Slide the IF-Display
section back until the RF section hooks catch the bottom of the
IF-Display section.
3. Line up the rear-panel lock feet, and tighten the thumb screws on
both lock feet.
4. Connect cable W31 between IF-Display section 52 and RF section
J6. See Figure 2-l.
5. Connect cable W30 between IF-Display section Jl and RF section
J l .
Figure 2- 1. Rear-Panel Cable Connections
6. Determine the ac line voltage to be used.
7. On each instrument section, slide open the power module's fuse
cover (located on the rear panel). See Figure 2-2. Push the
fuse-pull lever to the left. Remove the fuse.
W38
w31
w 3 7
J4
J 5

Advertisement

Table of Contents
loading

Table of Contents