Genie GCL-GT Installation Manual page 12

Heavy duty operator trolley
Hide thumbs Also See for GCL-GT:
Table of Contents

Advertisement

Drawbar Assembly
(continued)
6) Uncoil the drawbar chain and install by routing the chain over the chain
guides (A) and around the drive sprocket (B) on the output shaft as shown
in Fig. 6.
7) Attach to Chain Tension Adjusting Bolt (C) using a master link (provided).
8) Pass the other end of the chain between the front spreader bracket and
the idler pulley (D). Make certain the chain is not twisted.
9) Attach the chain to the carriage (E) using a master link.
10) Insert the Adjusting Bolt through the hole in the Carriage and place the
tensioning spring, flat washer and adjusting nut onto the bolt. Detail A,
Fig 6.
11) Tighten Chain so that it will not jump a sprockets or pulley. Add locknut.
Check to ensure the following:
• The chain is properly engaging the output sprocket.
• The chain is not twisted.
WARNING
• DO NOT apply line voltage until instructed to do so.
GCL-GT
Heavy Duty Operator
D
Figure 6
Detail A
MASTER
LINK
LOCKNUT
www.geniecompany.com
A
E
C
FLAT WASHER
TENSIONING
ADJUSTING NUT
SPRING
B
MASTER
LINK
CHAIN
TENSION
ADJUSTMENT
SCREW
03-12
4.4

Advertisement

Table of Contents
loading

Table of Contents