Genie GCL-GT Installation Manual page 11

Heavy duty operator trolley
Hide thumbs Also See for GCL-GT:
Table of Contents

Advertisement

Drawbar Assembly
(continued)
3) Insert the carriage into the tracks as shown in Fig. 4.
NOTE: The end of the carriage with the chain tension adjustment bolt should be
toward the operator.
4) Place the spreader bracket in position around the drawbar track. Do not
insert the round head screws and lock nuts at this time. The spreader
bracket will be held in place (temporarily) by the clevis pin which holds
the pulley.
5) Install the idler pulley inside the track by inserting the 3/8" x 4-1/2" clevis
pin through one side of the track and as you feed it through an idler
sleeve and the idler pulley followed by the second sleeve . Place fender
washer (7/16" x 1-1/4") over end of clevis pin. Secure clevis pin using
cotter pin. Fig. 5.
T O R
O P E R A
GCL-GT
Heavy Duty Operator
CARRIAGE
RAIL
D O O R
Figure 4
www.geniecompany.com
NOTE: For building of the spreader bracket assembly on a Dual Trolley or
Sidemount Trolley unit see the separate Drawbar instruction sheet for
Sidemount and Dual Trolley models.
IDLER PULLEY
FRONT
SPREADER
BRACKET
SLEEVE
ROUND HEAD SCREWS
/LOCKNUTS
DO NOT INSTALL YET!
COTTER PIN
CLEVIS PIN
WASHER
Figure 5
03-12
4.3

Advertisement

Table of Contents
loading

Table of Contents