Section 13 - Checkout
Check out for W7220 JADE
Inspect all wiring connections at the
economizer module's terminals and verify
compliance with the installation wiring
diagrams in the Installation Instructions.
To perform a checkout test:
1. Scroll to the desired test in the Checkout
menu using the up and down buttons on
the front of the W7220. Once you depress
the enter button for CHECKOUT, the
actuator will place the damper in a closed
position.
2. Press the enter button to select the item.
3. "RUN?" will display on the screen.
63-8594-02 Honeywell Economizers
Economizer:
TM
4. Press the enter button to start the test.
5. The unit will pause and then displays
"INPROGRESS" on the screen.
6. When the test is complete OR you "hear"
the relays close, "DONE" appears on the
screen or you can press the up arrow with
circle button to go to the next test.
7. When all parameters have been tested,
press the up arrow in circle button (Menu
up) to end the test.
The checkout tests can be performed at the
time of installation or any time during the
operation of the system to determine if the
system is operable.
172