Download Print this page

GReddy Turbo Kit Installation Manual page 9

2003 nissan 350z (vq35de) twin td05-18g 8cm2
Hide thumbs Also See for Turbo Kit:

Advertisement

3. Turbo Kit Installation
Thermo Cloth Installation
• Remove the bracket securing the fuel line right below the right side shock tower and
disconnect the fuel line. Flip the connector so that the line points up and reconnect the
line. Double wrap the fuel and evap Line using safety Wire. Leave the top bracket off
and secure the bottom back on as shown.
Important!
• Make sure that the fuel line is secured away from the turbine housing when the
turbo is installed. Some bending of the lines is necessary to achieve good
clearance.
• Make sure the lines are properly wrapped twice.
• Make sure to use safety wire to wrap the thermo cloth. Zip ties will melt from the
heat and eventually will come off.
• Make sure that the fuel line connector is properly clicked in all the way.
• GReddy Performance Products, Inc. will not be responsible for any damage
caused due to improper installation.
(This picture shows the turbo already installed)
(Parts used #58)

Advertisement

loading