Download Print this page

GReddy Turbo Kit Installation Manual page 15

2003 nissan 350z (vq35de) twin td05-18g 8cm2
Hide thumbs Also See for Turbo Kit:

Advertisement

Compression Pipe Installation
1. Install the Air flow meter adapter on tot he air flow meter.
2. Install the Compression pipe C-1, C-2, C-3, C-4, C-5, and C-6 by using the provided
hose and hose clamps as shown. Make sure to check all the clearance before
securing the hose clamps.
*
When installing the airflow meter assembly, make sure not to reverse the flow.
Radiator Over Flow Tank Installation
Remove the left side head light assembly, and Install the provided radiator over flow tank
as shown. Connect the hose to the lid and reinstall the head light assembly.
(Part Used #47, 48, 49, 50, 52, 68, 69)
(Part Used #7, 8, 9, 10, 11, 12, 13, 34, 35, 38, 41, 43, 44, 66, 67)
Secure the bracket on C-3 to the block
Secure the bracket on C-6 to the Intake manifold

Advertisement

loading