Download Print this page

GReddy Turbo Kit Installation Manual page 10

2003 nissan 350z (vq35de) twin td05-18g 8cm2
Hide thumbs Also See for Turbo Kit:

Advertisement

Caution!
• Make sure to check and double check this step. This is the most important
step in this install.
• Without proper clearance and thermo wrapping the fuel lines, the fuel line
connector can melt from heat and may catch on fire.
• Wrap the Starter and the Main Engine
harness right above the transmission bell
housing.
Important!
Make sure that the main engine harness is
properly wrapped and secured away from the
manifold and the wastegate when they are
installed.
Caution!
Without proper clearance and thermo wrapping the harness, it melt and cause a short
in the electrical system or may catch on fire.
Power Steering Line Installation
1. Remove the hose fitting off the power
steering pump and install the provided
fitting.
2. Cut the provided 15∅ hose to 200mm (8in)
and install it between the pump and the
tank.
Oil Pan Installation
Install the Oil pan with a silicone sealant.
(Parts Used #40, 45)
(Parts Used #33)
(Part Used #29)

Advertisement

loading