Download Print this page

Weider PRO 260 User Manual page 8

Weight bench exerciser
Hide thumbs Also See for PRO 260:

Advertisement

Insert a Pad Tube (19) into the Leg Lever (3).
Slide two Foam Pads (20) onto the Pad Tube.
Repeat this step with the other two Pad Tubes
(19) and the Leg Lever (3) and Front Leg (2).
10. Attach the Curl Pad (15) to the Curl Post (11) with
two M6 x 16mm Screws (39).
11. Route the Lat Cable (35) through the Lat Tower
(8) and over the Pulley (38). Make sure that the
Cable is under the lat rest bar. Attach the
Pulley inside the Lat Tower with an MIO x 60mm
Bolt (47), two MIO Washers (44), two lOmm
Large Spacers (31), and an MIO Nylon Locknut
(43).
12. Insert an MIO x 19mm Bolt (53) into the bracket
on the Weight Carriage (9).
Slide the Weight Carriage (9) onto the Lat Tower
(8). Make sure the bracket
on the Weight
Carriage and the lat rest on the Lat Tower (see
step 11) are on opposite
sides of the Lat
Tower. Attach the Lat Cable (35) to the MIO x
19mm Bolt (53) with an MIO Nylon Locknut (43).
13. Make sure that all parts are properly tightened
before the weight
bench is used. The use of all
remaining parts will be explained in ADJUST-
MENTS, beginning on the following page.
10
11
12
20
19
19
15
11
39
Lat Rest
43
31
31 ")
47
--8
8

Advertisement

loading

This manual is also suitable for:

831.15609.0