Dell OpenManage Network Manager Client Manual page 201

Web client guide 5.1
Hide thumbs Also See for OpenManage Network Manager:
Table of Contents

Advertisement

Execute Report— When you execute a
report, a numbered message
notification appears, and a link to the
report appears in the Messages panel
to notify you the report is ready for
viewing. Click the magnifying glass to
the right of the notification to view
either the audit trail or the report.
NOTE:
Reports with lots of data may take a long
time to appear without much indication that
they are in process. This is an artifact of the
Acrobat plug-in, and outside the scope of Dell OpenManage Network Manager to influence. Acrobat
also produces an error if a report has too much data to display meaningfully.
Execute Report (Advanced)— Also lets you schedule reports.
Aging Policy—If you automate report generation, you may also want to configure a Database
Aging Policy to insure the volume of reports does not overwhelm your storage capacity. See
Redcell > Database Aging Policies (DAP) on page 50 for more about doing that.
Delete— Removes the selected report from the list display
Delete History— Removes the selected report's history.
To change reports' appearance and contents, you must configure their Report Templates. Also, see
Branding Reports on page 206 for instructions about changing the default report logo.
When you View or Execute Report (Advanced), by right clicking either a listed report or a historical
instance of that report, a configuration screen appears that lets you select several parameters.
Reports | Resource Management
201

Advertisement

Table of Contents
loading

This manual is also suitable for:

Openmanage network manager 5.1

Table of Contents