Check items
Are sufficient AC outlets, on different
*
lines, available for the equipment?
Does the input voltage correspond to
*
the equipment specifications?
Are the input circuit breakers adequate
*
for equipment loads?
Does the input frequency correspond to
*
equipment specifications?
Is an appropriate uninterruptible power
supply (UPS) strategy in place?
If lightning arresters are recommended,
are they installed?
Have all sources of electrical
*
interference been corrected?
Does the customer site have access
control (for example, do HP
representatives need an escort)?
Does the computer room have access
control (for example, do HP
representatives need a security code)?
Are all floors, stairs, elevators,
stairwalkers, lifts, ramps, or ladders
*
needed to move the equipment
adequate to support its weight and size?
Will the equipment fit through all doors
*
and corridors and in lifts?
Does the building have a loading dock?
*
Maximum access height is _____m.
Additional equipment
For any additional equipment required
(for example, connectors, receptacles,
cables, and any equipment not supplied
by HP), is the equipment on site and
ready for use?
Site preparation time allowances
The following site preparation tasks may require several weeks:
•
Acquiring required power connectors
•
Arranging for an electrician
•
Adding or modifying air conditioning systems
•
Making building alterations
14
Site preparation team and tasks
Yes
No
Reference
Electrical
requirements, page 37
Electrical
requirements, page 37
Electrical
requirements, page 37
Electrical
requirements, page 37
Uninterruptible power supply
(UPS), page 39
Protection against sources of electrical
interference, page 39
Protection against sources of electrical
interference, page 39
N/A
N/A
Dimensions and
Dimensions and
Dimensions and
N/A
N/A
weights, page 19
weights, page 19
weights, page 19