Arrow BY1012-A Owner's Manual & Assembly Instructions page 10

Table of Contents

Advertisement

Anchoring
AIO
it is important
that the entire floor frame be anchored
after the building
is erected.
Below are recommended ways of anchoring.
Arrow
Anchoring
Kit: (Model No. AK4 or 60298)
Recommended for use with any suggested base.
Contains: 4 Anchors with Cable, Clamps and
installation instruction.
&
OVERTHE
BEAMS
AND iNTO THE GROUND
Anchoring
into Wood/Post:
Use 1/4" Wood Screws. There are 1/4" (0,63cm) dia.
holes provided in the frames for proper anchoring.
Arrow
Anchoring
Kit: (Model No. AK100 or 68383)
Recommended for use with the concrete foundation.
Contains:
Corner gussets, perimeter clips, hardware,
1/4" masonary drill bit and installation instruction.
Anchoring
into Concrete:
1. For poured concrete slab or footing or patio blocks:
Use 1/4" x 2" Lag Screws.
2. For Anchor Post of Concrete poured after building is
erected: Use 1/4"x 6" Lag Screws.
,
10

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eh1012-bWl1012-a697.68102-aVl101262-b

Table of Contents