Performance Verification Test Overview; Performance Verification Test; Dc Voltage Verification Test - Agilent Technologies U3402A User's Manual And Service Manual

51/2 digit dual display multimeter
Hide thumbs Also See for U3402A:
Table of Contents

Advertisement

Performance Verification Test Overview

Performance verification test is an extensive set of tests that are recommended
as an acceptance test when you first received the
Use the performance verification test to verify the measurement performance
of the instrument. The performance verification test uses the instrument's
specifications listed in

Performance Verification Test

The performance verification test is recommended as acceptance tests when
you first received the instrument. The acceptance test results should be
compared against the one- year test limits. After acceptance, you should repeat
the performance verification tests at every calibration interval.
If the instrument fails performance verification, adjustment or repair is
required. Contact your local Agilent Service Center for details.
Make sure you have read
N O T E
verification test.
This test checks the full- scale reading accuracy of the instrument.

DC Voltage Verification Test

1 Connect the calibrator to the front panel Hi and Lo input terminals.
2 Select each function and range in the order shown in
3 Make a measurement and observe the result. Compare measurement results
U3402A User's and Service Guide
"Test Considerations"
input shown in
Table 4-
to the appropriate test limits shown in the
for appropriate source settling when using the Fluke 5520A.)
Chapter
6, "Specifications and Characteristics".
on page 64 before doing the performance
2.
Performance Test
instrument.
Table 4-
2. Provide the
Table 4-
2. (Be certain to allow
4
65

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents