POST Phase
HP Kayak XW 0480 PC Workstation — Troubleshooting Your HP PC Workstation
Following these checks, the POST (Power-On Self Test) sequence is
initiated. One of the following screens will appear in this phase:
HP KAYAK XU
No errors occurred.
Other Features
HP MaxiLife can also be configured to:
Display the configuration details of your PC Workstation required to
•
obtain support (System info.)
Indicate POST (Power-On Self Test) steps during the power-on
•
phase (Boot steps)
Perform diagnostic tests on your PC Workstation's various hardware
•
components and display the results (Diags).
To configure your HP LCD:
1 Ensure that your PC Workstation's power cord is connected to a
grounded outlet.
In this state, your PC Workstation's hardware management chip is
active, even if your system is not powered on.
2 Press one of the LCD control buttons. The following menu is
displayed.
System info
Boot steps
Next
3 Use
to scroll down through the menu items and
required menu item.
W
Error!
POST XXXX
A POST error occurred. Refer to "If a POST
Error Message is Displayed" on page 10 for
more information.
Go
Using HP MaxiLife to Diagnose Problems
Diags
Exit
Next
Go
to select the
English
3