Step 1-Preparing The Workstation - HP Z210 Series Rack Mounting Instructions

Hp z200, z400 and xw4000 workstations - rack mount tray installation
Hide thumbs Also See for Z210 Series:
Table of Contents

Advertisement

Step 1—Preparing the workstation
NOTE:
All illustrations are examples only. Workstation models vary. For product-specific information,
see the service guide for your HP workstation at
beginning installation.
To prepare the workstation for component installation:
1.
Power down the workstation, and then disconnect the power cord.
2.
Power down all external devices, and then disconnect them from the workstation.
Step 2—Mounting the rails to the rack
1.
Attach the rails to the rack. See Appendix A for installation instructions.
2.
If glide strips were not factory-installed, then apply them to the rail shelf.
a.
Remove the adhesive backing from the back of the glide strips.
b.
Apply a glide strip to the top surface of each rail.
Figure 1
ENWW
Applying glide strips
http://www.hp.com/support/manuals
Step 1—Preparing the workstation
before
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z400Xw4000 seriesZ200Z400 seriesZ200 series

Table of Contents