Installing The Operation Panel [3] - Brother BAS-342G PS Instruction Manual

Direct drive programmable electronic pattern sewer, "perfect stitch"
Hide thumbs Also See for BAS-342G PS:
Table of Contents

Advertisement

4. INSTALLATION

4-7. Installing the operation panel [3]

< If the sewing machine was already installed to the table when it was delivered >
9
3970M
3971M
BAS-342G PS
(1) Cushion A
(2) Operation panel base
(3) Plain washers (medium) [3 pcs.]
(4) Bolts [3 pcs.]
(5) Cushions B [3 pcs.]
(6) Plain washers (large) [3 pcs.]
(7) Nuts [6 pcs.]
* Tighten until the thickness of
cushion B (5) is about 1 mm.
(8) Rubber seat
(9) Operation panel stand
(10) Operation panel
* Pass the cords of the operation
panel (10) through the operation
panel stand (9) and under the
table.
(11) Bolts [3 pcs.]
(12) Bolt
(1) Operation panel
(2) Bolts [3 pcs.]
* Pass the cords of the operation
panel (1) through the operation
panel stand (3) and under the
table.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents