12
C
HAPTER
Installing the
Locking Bar
Downloaded from
www.Manualslib.com
2: I
B
NSTALLING THE
RIDGE
2 Route the power and Ethernet cables through the large opening in the cradle.
Figure 5 shows a cable being routed under the cradle.
Figure 5 Routing Cable Under the Cradle
3 Connect the power and Ethernet cables to the ports on the Bridge.
4 Snap the Bridge onto the cradle.
For additional security, install the locking bar in the cradle after the Bridge
is mounted to the wall. Use your own lock to secure it in place.
To install the locking bar:
1 Insert the locking bar through the opening in the side of the cradle, as
shown in Figure 6.
Figure 6 Inserting the Locking Bar
manuals search engine
Need help?
Do you have a question about the 3CRWE675075 - 11a/b/g Wireless LAN Workgroup Bridge and is the answer not in the manual?