Connecting The Cords - Brother BAS-326G PS Instruction Manual

Direct drive programmable electronic pattern sewer
Hide thumbs Also See for BAS-326G PS:
Table of Contents

Advertisement

3. INSTALLATION

3-8. Connecting the cords

<Main P.C. board>
NOTE:
• Check that the connector is facing the correct
way, and then insert it firmly until it locks into
place.
• Secure the cables with cable ties and cord
clamps, while being careful not to pull on the
connector.
*
1
: Be sure to make the ground connection.
(Refer to "3-9. Connecting the ground wire".)
*
2148B
11
Connector
X pulse motor encoder 5-pin white
Y pulse motor encoder 5-pin blue
Work clamp pulse motor encoder 5-pin black
Foot switch 10-pin
Operation panel 8-pin
Machine head switch 3-pin
Home position sensor assembly 12-pin
STOP switch 6-pin
Valve harness 12-pin
Programmer relay harness 8-pin
Solenoid selection harness 4-pin
2
The 4-pin solenoid selection harness may not be used for some versions of tension release solenoid.
:
2147B
Connection location on
main P.C. board
P20 (X-ENC)
P4 (Y-ENC)
P5 (P-ENC)
P6 (FOOT)
P1 (PANEL)
P9 (HEAD-SW)
P8 (SENSOR1)
P13 (HEAD)
P12 (AIR1)
P7 (PRG)
*
2
P3(CUTTER)
BAS-326G PS
1. Gently tilt back the machine head.
2. Pass the cord bundle through the hole
in the work table.
3. Loosen the two screws (1), and then
open the cord presser plate (2) in the
direction of the arrow and pass the
cord bundle through the opening
together with the following cords.
• Two-pedal foot switch (3)
• Operation panel (Do not pass the
ground wires through the hole.)
• Solenoid valve assembly
4. Securely connect the connectors as
indicated in the table below.
NOTE:
• Check that the connector is facing
the correct way, and then insert it
firmly until it locks into place.
• Secure the cables with cable ties
and cord clamps, while being careful
not to pull on the connector.
Lock the cord
clamp securely.
Cord clamp
(3)
(3)
(3)
(3)
(3)
(4)
(4)
(4)
(4)
(3)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents