Brother BAS-326G PS Instruction Manual page 15

Direct drive programmable electronic pattern sewer
Hide thumbs Also See for BAS-326G PS:
Table of Contents

Advertisement

Needle plate
Work clamp arm
1856B
2143B
BAS-326G PS
3. INSTALLATION
(10) Auxiliary plate
(11) Bolts with washer [10 pcs.]
Loosen the bolts with washer (12) and
adjust so that the auxiliary plate (10) and
the needle plate are at the same height.
NOTE:
Install the auxiliary plate so that it is
horizontal.
Move the work clamp arm all the way to
the right when looking from the front of
the sewing machine (the direction of the
arrow in the illustration), and then gently
tilt back the machine head.
NOTE:
Two or more people should tilt back the
machine head, and it should be tilted
gently while being held with both
hands.
6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents