Installing The Machine Head - Brother BAS-326G PS Instruction Manual

Direct drive programmable electronic pattern sewer
Hide thumbs Also See for BAS-326G PS:
Table of Contents

Advertisement

3. INSTALLATION

3-4. Installing the machine head

Pulse motor
Approx. 20 mm
5
Approx. 20 mm
1855B
4913Q
BAS-326G PS
(1) Pins [2 pcs.]
(2) Set screws [2 pcs.]
(3) Hinge rubber assemblies [2 pcs.]
Place the machine head gently on top of
the oil pan and the rubber cushions.
NOTE:
• Be careful not to get the cords
clamped between the machine head
and the oil pan.
• When holding the machine head, do
not hold it by the pulse motor. This
may cause problems with operation
of the pulse motor.
(4) Hinge holders [2 pcs.]
(5) Bolts [4 pcs.]
(6) Plain washers [4 pcs.]
(7) Nuts [4 pcs.]
(8) Head rest
(9) Bolts with washer [4 pcs.]

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents