Advertisement

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MultiTest-5i and is the answer not in the manual?

Questions and answers

Summarization of Contents

Installing Your Test System
Receiving and Unpacking
Procedure for safely receiving and unpacking the Mecmesin test system.
Placing and Securing the Machine
Guidance on positioning and securing the test system on a stable surface.
Emergency Stop Button (E-stop)
Information on the function and accessibility of the emergency stop button.
Ventilation
Ensuring adequate ventilation to prevent overheating of the test system.
Electrical Supply and Earthing
Correct connection to mains power, voltage selection, and earthing requirements.
Using Your Test System
Interlocked Enabled Test Systems
Details on interlock functionality and override plugs for test systems.
Switching On
Steps for powering on the test system and checking readiness indicators.
Computer-Controlled Test Frames
Guidance for using test frames controlled by external computers, including remote software and failure scenarios.
In the Event of a Mains Power Failure
Details actions to take if the mains power fails during operation.
Finishing a Test
Recommends safe procedures for removing samples after testing.
Using Systems with Other Equipment
Covers system integration, digital I/O, and machinery directives.
Digital Inputs and Outputs
Explains the use of digital input and output connections for system integration.
Assemblies of Machines and Machinery Directive
Addresses compliance with machinery directives for integrated systems.
Interlocking Guards General Information
Provides general information on Mecmesin's interlocking guard systems.
Interlocking Guards (OmniTest-5 and Twin Column)
Details interlocking guard functionality for OmniTest-5 and twin column systems.
Interlocking Guards (MultiTest Twin-column)
Explains interlocking guards for Mecmesin MultiTest twin-column systems.
Interlocking Guards (MultiTest Single column)
Describes interlocking guards for Mecmesin MultiTest single-column systems.
Removing or Relocating Your Test System
Lifting the Test System
Safe procedures for lifting and moving the test system, considering its weight.
Disabling and Scrapping
Steps for decommissioning and disposing of the test system at end-of-life.
Servicing, Calibration, Maintenance and Repair
Replacing Fuses
Instructions for safely replacing fuses in the test system's power inlet.
Servicing and Calibration
Importance of regular servicing and calibration by authorised personnel.
Cleaning
Guidelines for safely cleaning the exterior and keypad of the test system.
Repair
Procedures for handling system failures and the importance of authorised repair.
Operator Safety
Training
Emphasizes the necessity of proper training for operating test systems and guards.
Avoid Prolonged Use of Console or Keyboard
Advises on avoiding repetitive strain injuries from prolonged use of controls.
Eye Protection and Protective Clothing
Recommends PPE, including eye protection, for safe operation and potential hazards.
EC Declaration of Conformity
Document Listing
Lists the EC Declaration of Conformity documents applicable to Mecmesin products.

Table of Contents