Advertisement

Recordall® Turbo Series Meters
Models 160 (1-1/2"), 200 (2"), 450 (3"), 1000 (4"), 2000 (6"),
3500 (8"), 5500 (10"), 6200 (12"), 6600 (16") & 10000 (20")
User Manual
RTS-UM-00380-EN-09 (January 2015)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 2000 and is the answer not in the manual?

Questions and answers

Summarization of Contents

Scope of this Manual
Product Description
Explains the design features, materials, and operation of the Recordall Turbo Series meters.
Accessories
Details compatibility with AMR/AMI systems and the recommendation for strainers.
Related Literature
Lists supporting documents like Product Data Sheet and Parts List.
Safety Information
Unpacking and Inspection
Provides procedures for safely unpacking and inspecting meters upon receipt.
Installation
Preinstallation Considerations
Covers essential checks and recommendations before installing the meter.
Installing the Meter
Details the step-by-step process for physically installing the meter into the pipeline.
Performance Checks
Outlines checks to ensure the meter is operational after installation.
Maintenance
Maintenance Equipment
Lists the tools and equipment needed for meter servicing.
Preventive Maintenance
Explains the purpose of preventive maintenance for meter longevity and efficiency.
Periodic Inspection
Describes visual checks for wear and operational verification.
Cleaning
Details how to clean the meter's exterior and internal components.
Shutdown Instructions
Provides guidance on flushing meters before extended shutdown or removal.
Calibration Check and Adjustment
Explains how to check and adjust meter accuracy after service.
Accuracy Test
Details the procedure for performing an accuracy test on the meter.
Calibration
Describes the calibration mechanism and how to adjust it for accuracy.
Servicing Parts and Assemblies
Removing the Meter Head
Provides instructions for removing the meter head assembly from the housing.
Removing the Local Register or Encoder
Explains how to detach the register or encoder for in-line service.
Removing the Measuring Element
Details the steps to remove the meter's measuring element.
Removing the Magnet Carrier
Outlines the procedure for removing the magnet carrier for inspection or replacement.
Removing the Straightening Vanes/Nose Cone
Describes how to access and remove the upstream and downstream nose cone assemblies.
Removing the rear nose cone
Instructions for removing the rear nose cone assembly.
Removing the Calibration Mechanism
Explains how to disassemble and remove the meter's calibration mechanism.
Reassembling the Calibration Mechanism
Provides steps for correctly reassembling the calibration mechanism.
Inspecting the Rotor and Bearings
Details how to inspect the rotor and bearings for wear or damage.
Reassembling the Rotor and Bearings
Outlines the procedure for reassembling the rotor and bearing components.
Reinstalling the Turbo Meter Head Assembly
Steps for properly reinstalling the meter head assembly.
Placing the Meter Back in Service
Describes how to return the meter to service after maintenance.
Specifications
1-1/2" to 12" Meters
Lists specifications for meter sizes from 1-1/2" to 12".
Materials
Details the materials used for various meter components.
16" and 20" Meters
Presents specifications for the larger 16" and 20" meter models.
Materials
Lists the materials used for components in 16" and 20" meters.

Table of Contents

Save PDF