The following section describes environmental and safety precautions for the
gateway, including:
!
!
!
!
Preparing the Installation Environment
Before you install the gateway, make sure that the installation environment is
clean, dry, and dust free. Take the following precautions to maintain a safe
working environment and to avoid accidents:
!
!
!
Ventilation
Gateways can generate substantial heat during operation and therefore require
adequate ventilation. You might need to install the gateway in an air-
conditioned room to ensure that its internal cooling system can maintain
acceptable temperatures during operation.
Warning
Do not block any ventilation slots on the gateway. Internal components
might overheat and be damaged.
Nokia 100i Installation Guide
Preparing the Installation Environment
Safety Precautions
Electrical Power Source
Product Disposal
Inspect the area for hazards, such as bare wires and standing water.
Remove scarves and neckties, jewelry, and other loose items before you
install the gateway.
Do not remove the gateway cover under any circumstances.
Preparing the Installation Environment
17
Need help?
Do you have a question about the 100i - IP VPN - Gateway and is the answer not in the manual?