Booting The Switch; Verifying Installation Before Power-Up; Powering Up The Switch - H3C LS-S5600-26C-OVS Installation Manual

S5600 series ethernet switches
Table of Contents

Advertisement

Installation Manual
H3C S5600 Series Ethernet Switches
Step 10: Click <OK>.
Figure 4-6 Settings tab

4.4 Booting the Switch

4.4.1 Verifying Installation before Power-up

Before powering up the switch, check that:
Both the power cord and the grounding wire are correctly connected.
Proper power supply is used.
The console cable is correctly connected.
The console terminal (or PC) has been started and the related parameters have
been set on it.

4.4.2 Powering up the Switch

Starting......
***********************************************************
*
*
H3C S5600 BOOTROM, Version 409
*
***********************************************************
Copyright(c) 2004-2007 Hangzhou H3C Technologies Co., Ltd.
4-4
Chapter 4 Starting up the Switch at the Initial Boot
*
*
*

Advertisement

Table of Contents
loading

Table of Contents