Page 1
- Stunning stylish European inspired design - Durable stainless steel frame construction - Square stainless thin profile shower head - 3 stage shower functions (Rainfall, Massage Spray, Hand Shower) - Contemporary brass hand shower - Tempered glass shelf Luxier SP21-SS Rev. A5 022018...
Page 2
Should a malfunction occur within the warranty period, Luxier USA will, as its option, (1) repair or replace the defective part(s) or product(s) at no charge; (2) issue a refund of the original purchase price of the product(s) (Valid within 30 days from the date of purchase);...
Page 3
An outlet box such as the Sioux Chief Ox Box 696-G2001MF, 696-G2303MF, or 696-2403MF is recommended to expedite the installation process of the shut off valves. (NOTE: additional parts such as brass reducer / adapters are required but not included with this product) Luxier SP21-SS Rev. A5 022018...
Page 4
NOTE: This distance vary by models, always take the actual measurement from the shower panel) (This is the distance from the oor to the bottom edge of the shower panel) Luxier SP21-SS Rev. A5 022018...
815mm 32.09” 4. Using a drill with a tile bit, drill the hole slowly into the tile. Do not drill into any piping or wiring in the wall. Insert the anchors into the wall. 1” Luxier SP21-SS Rev. A5 022018...
Page 8
After the shower panel is set properly on the wall, apply silicon sealant on both sides of the shower panel to prevent the unit from moving. (NOTE: Do not seal the bottom of the panel.) Luxier SP21-SS Rev. A5 022018...
Page 9
Tighten the set screws to secure the glass shelf. (WARNING: Do not place heavy objects on the glass shelf. Do not excess weight limit of 2 pounds when placing objects on the shelf) Luxier SP21-SS Rev. A5 022018...
8. After cleaning, rinse thoroughly with clean water to remove any cleaner residue. 9. Wipe dry with soft cloth to keep shower panel surface spot free. Luxier SP21-SS Rev. A5 022018...
The check valve should open when the center is pushed with tip of a pen or a cotton swab. The check valve should close automatically when no external pressure is applied to the center part of the valve. Luxier SP21-SS Rev. A5 022018...
Page 12
(NOTE: When inserting the thermostatic valve, make sure the marking on the tip of the valve is pointing up at 12 o’clock position as seen in Figure E) 10. Turn on water supply to the unit and test the system for leak. Luxier SP21-SS Rev. A5 022018...
Page 13
6. Once the temperature is set, install the Temperature Control Knob #3. (NOTE: The Safety Pin should be pointing at 12 o’clock) and tighten setscrew #2 Fig. F Fig. H Safety Pin Chrome Trim with Temperature Scale (4) Temperature Limit Stop (5) Termostatic Valve (7) Fig. G Luxier SP21-SS Rev. A5 022018...
Need help?
Do you have a question about the SP21-SS and is the answer not in the manual?
Questions and answers