HUCK Seiltechnik GmbH • Dillerberg 3 • D-35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Assembly Instructions FUN-Parcours 2010 „Climbing play – small disks“ Article No. 4960-3 Attention! Only use the assembly instructions included in the scope of delivery for the assembly, installation and maintenance of the respective equipment!
HUCK Seiltechnik GmbH • Dillerberg 3 • D-35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Introduction Assembling General information This equipment should be installed, inspected, maintained and operated in accordance with EN1176-7 guidelines. Before installation work commences, please check that you have all of the equipment and fixation components in the parts list provided (see Tables 3-1 and 3-2).
Assembly time with finished concreting of the steel masts: about 3 hours . Required assistants: 2-3 persons Possibly required spare parts can be obtained directly from your supplier or from the company Huck Seiltechnik GmbH Adress: Huck Seiltechnik GmbH Dillerberg 3 D-35614 Aßlar/Berghausen...
Page 6
HUCK Seiltechnik GmbH • Dillerberg 3 • D-35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Drawings / Views All optical drawings are showing only the measurements/dimensions and are no mandatory technical views of the complete item. We reserve the right to change technical details of our articles which are serving for the further development of our articles and are reasonable for the customer.
HUCK Seiltechnik GmbH • Dillerberg 3 • D-35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Delivery contents (parts list with part numbers) 3.1. In words Table 3-1: Delivery contents, in words Element / Pos. Quantity Size O.K. Missing Description Galvanised steel mast Ø 102 mm; 2400 mm Play part (small plates) Lg.
HUCK Seiltechnik GmbH • Dillerberg 3 • D-35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net 3.2. In symbols Table 3-2: Delivery contents, in symbols Pos. Quantity Symbol Ø 102 mm; 2400 mm Lg. 2898 mm für Ø 102 mm für Ø 102 mm Ø 102 mm...
HUCK Seiltechnik GmbH • Dillerberg 3 • D-35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Post installation checks If the equipment has not been installed safely, you must ensure that the public is prevented from using it. Marking filler depth Labelling the posts to show the depth of material provided as fall protection (i.e.
HUCK Seiltechnik GmbH • Dillerberg 3 • D-35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Introduction Maintenance General informations This equipment should be installed, inspected, maintained and operated in ac- cordance with EN 1176-7 guidelines. Please note: Providing any necessary repairs are carried out, a piece of play equipment that is inspected regularly cannot become so damaged that it is dangerous.
HUCK Seiltechnik GmbH • Dillerberg 3 • D-35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net General maintenance information Maintenance intervals Maintenance intervals are based on average use. Please note that more fre- quent inspections and/or maintenance are required if the play equipment is subject to intensive use.
Page 19
HUCK Seiltechnik GmbH • Dillerberg 3 • D-35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Faults Faults must be repaired as soon as they are detected. If serious defects that compromise safety cannot be repaired straight away, the public must be prevented from using the equipment with immediate effect.
HUCK Seiltechnik GmbH • Dillerberg 3 • D-35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Maintenance timetable Special advices 8.1.1 Maintenance interval We strongly advise you to carry out inspections and maintenance work within the specified periods as use of the equipment, the weather and malicious van- dalism cause wear and tear that compromises the safety and function of the equipment.
HUCK Seiltechnik GmbH • Dillerberg 3 • D-35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net Regular maintenance Monthly maintenance 10.1 Check the spaces between the equipment and the ground (clearance and height of fall). 10.2 Check the ground surface in the area with fall protection for hard objects and loose foundations.
Zinc paint should be applied to corroded areas and scratches. The equipment must be inspected by someone with the necessary expertise in strict compliance with the instructions issued by Huck Seiltechnik GmbH. A copy of the inspection record should be given to the operator, who must confirm receipt.
After the installation of the equipment pass the installation and mainte- nance documents to the operator. The operator has to receive the hand over documents. The complete filled and signed hand over document should be sent to the supplier Huck Seiltechnik GmbH via Telefax +49 6443 8311-79 Art.-No.: 4960-3 FUN-Parcours 2010 „Climbing play –...
Page 28
HUCK Seiltechnik GmbH • Dillerberg 3 • 35614 Asslar-Berghausen seiltechnik@huck.net www.huck.net S e i l t e c h n i k Date: _______________________ \\CAD1\Standard\4960-3\Montageanleitung\Fun_Parcours_kleine_Teller_4960_3_ST_B_L_02_GBR.doc...